TASKS OF THE PHASE II
(2005-2008)


The surface system: power generation

      Tasks concerning the surface activities

  • Long term circulation / Power plant Preparation and basic design/ installation (6 MWe)

The underground system: EGS heat exchanger


      Tasks concerning the reservoir activities