VSP survey at Soultz



Task 3: Vertical Seismic Profiling survey at Soultz

VSP setup on site with 2 cranes
Deployement of two high temperature (200°C) seismic sondes designed by Baker Hughes in GPK3 and GPK4
April 2007
Trucks mounted vibrators
Using of two vibrators (trucks mounted) operating by the Greek company LandTech
April 2007
Mesy stuff in full activity
Operating the first winch (MeSy winch) by the staff of the company MeSy GEO - Meßsysteme GmbH: Florian Seebald, Ulrich Weber and Gerd Klee
April 2007
VSP data collecting
VSP data collecting during 4 weeks for VSP Data processing performed by VSFusion company
Running the second winch (CSMA winch) by the GEIE stuff N.Cuenot (seismic specialist on site (GEIE)) and G.P.Fath
April 2007