VSP setup on site with 2 cranes
Deployement of two high temperature (200°C) seismic sondes designed by Baker Hughes in GPK3 and GPK4
|
April 2007 |
|
Trucks mounted vibrators
Using of two vibrators (trucks mounted) operating by the Greek company LandTech
|
April 2007 |
|
Mesy stuff in full activity
Operating the first winch (MeSy winch) by the staff of the company MeSy GEO - Meßsysteme GmbH: Florian Seebald, Ulrich Weber and Gerd Klee
|
April 2007 |
|
VSP data collecting
VSP data collecting during 4 weeks for VSP Data processing performed by VSFusion company
Running the second winch (CSMA winch) by the GEIE stuff N.Cuenot (seismic specialist on site (GEIE)) and G.P.Fath
|
April 2007 |