STIMULATION GPK3 AND GPK4, TESTS AND MAINTENANCE



Task 2: Stimulation GPK3 and GPK4, tests and maintenance of reservoir and wellheads

Low Rate Hydraulic Test of GPK2, 3 and 4:
Puls Test for GPK2
February 2006
Preparation for Killing od wells:
To kill wells for works on wellheads without pressure, brine will be injected.
Mixing of brine = water and salt with density of 1,13 g/cm3
March 2006
Low Rate Hydraulic Test of GPK2, 3 and 4:
Online Conductivity measurement
March 2006
Low Rate Hydraulic Test of GPK2, 3 and 4:
Low Rate Injection Pump
March 2006
Temperature-Logging GPK3 and GPK4:
Temperature Logging online with Pt1000 GGA-Tool performed by GGA-Institute Hannover (Germany)
March 2006
Flow - Log GPK4
Flow-Log performed by Schulze GmbH Company (Schulze wellpressure-recording Salzwedel, Germany) with Panex-Tool 2675B MRO Flowmeter 175°C/700 bar
March 2006
Steel pipe instaed of flexible hose pipe
The old hose connection (limited temperature) between injection pump and wellheads has been replaced by steel pipe PN40
April 2006
Revision of separator
The separator has been completely overhauled
April 2006
Acidizing GPK4 (RMA)
Acidification of GPK4 to improve the productivity - reduce skin in reservoir and creating new pathways around the borehole (Mud Acid)
May 2006
Revision Downhole Seismic
Revision of downhole seismic sondes (accelerometers), rebuilding of high temperature amplifiers
September 2006
Flow-Log GPK3
Flow-Log (Injection of 30 l/s) of GPK3 with Schlumberger tools and staff for casing inspection and measurement of open hole
October 2006
Flow-Log GPK4
Flow-Log (Injection of 30 l/s) of GPK4 with Schlumberger tools and staff for casing inspection and measurement of open hole
October 2006
Production Test GPK3
Production of brine out of GPK3 during 2,5 days (~1.500 m3)
October 2006
Stimulation NTA GPK4
Injection of 200m2 NTA for chemical stimulation of reservoir GPK4
October 2006
Maintenance Wellhead GPK 4
Replacing pack-off GPK4 Viton-Gasket and maintenance of Valves and Wellhead (Greasing, new gaskets etc.)
Welding the landing ring on Casing 9 5/8"
November 2006
GTC Fiber optic cable for Temperature Logging EPS1
Installation of Fiber optic cable for Temperature Logging EPS1 (GTC)
November 2006
Maintenance Wellhead GPK 3
Replacing pack-off GPK3 Viton-Gasket and maintenance of Valves and Wellhead, Installation of re-conditioned Packoff
December 2006
Maintenance Wellhead GPK 3
Old Gasket to be replaced, GPK3 Pack off
December 2006
Injection and Production tests GPK3 and GPK4
Activation GPK3 and GPK4, Production GPK3 and GPK4, Injection SRT GPK4, Injection OneStep GPK3
January 2007
Stimulation of GPK3 and GPK4 with OCA
Chemical treatment if GPK3 and GPK4 with Organic Clay Acid
February 2007
Production tests GPK3 and GPK4 after OCA-injection
Production of GPK3 and GPK4 for 2-3 days after OCA-Treatment to determine the productivity
March 2007
Injection test 30 l/s into GPK3
Injection of 10.000 qm of fresh water into GPK3 with injection pump
June 2007
Injection test 30 l/s into GPK3
Measurement of T and p on surface, but also downhole with 2 memory tools and one online tool. Dowhole logging performed by Schulze wellpressure-recording
June 2007