Low Rate Hydraulic Test of GPK2, 3 and 4:
Puls Test for GPK2
|
February 2006 |
|
Preparation for Killing od wells:
To kill wells for works on wellheads without pressure, brine will be injected.
Mixing of brine = water and salt with density of 1,13 g/cm3
|
March 2006 |
|
Low Rate Hydraulic Test of GPK2, 3 and 4:
Online Conductivity measurement
|
March 2006 |
|
Low Rate Hydraulic Test of GPK2, 3 and 4:
Low Rate Injection Pump
|
March 2006 |
|
Temperature-Logging GPK3 and GPK4:
Temperature Logging online with Pt1000 GGA-Tool performed by GGA-Institute Hannover (Germany)
|
March 2006 |
|
Flow - Log GPK4
Flow-Log performed by Schulze GmbH Company (Schulze wellpressure-recording Salzwedel, Germany)
with Panex-Tool 2675B MRO Flowmeter 175°C/700 bar
|
March 2006 |
|
Steel pipe instaed of flexible hose pipe
The old hose connection (limited temperature)
between injection pump and wellheads has been replaced by steel pipe PN40
|
April 2006 |
|
Revision of separator
The separator has been completely overhauled
|
April 2006 |
|
Acidizing GPK4 (RMA)
Acidification of GPK4 to improve the productivity - reduce skin in reservoir and creating new pathways around the borehole (Mud Acid)
|
May 2006 |
|
Revision Downhole Seismic
Revision of downhole seismic sondes (accelerometers), rebuilding of high temperature amplifiers
|
September 2006 |
|
Flow-Log GPK3
Flow-Log (Injection of 30 l/s) of GPK3 with Schlumberger tools and staff for casing inspection and measurement of open hole
|
October 2006 |
|
Flow-Log GPK4
Flow-Log (Injection of 30 l/s) of GPK4 with Schlumberger tools and staff for casing inspection and measurement of open hole
|
October 2006 |
|
Production Test GPK3
Production of brine out of GPK3 during 2,5 days (~1.500 m3)
|
October 2006 |
|
Stimulation NTA GPK4
Injection of 200m2 NTA for chemical stimulation of reservoir GPK4
|
October 2006 |
|
Maintenance Wellhead GPK 4
Replacing pack-off GPK4 Viton-Gasket and maintenance of Valves and Wellhead (Greasing, new gaskets etc.)
Welding the landing ring on Casing 9 5/8"
|
November 2006 |
|
GTC Fiber optic cable for Temperature Logging EPS1
Installation of Fiber optic cable for Temperature Logging EPS1 (GTC)
|
November 2006 |
|
Maintenance Wellhead GPK 3
Replacing pack-off GPK3 Viton-Gasket and maintenance of Valves and Wellhead,
Installation of re-conditioned Packoff
|
December 2006 |
|
Maintenance Wellhead GPK 3
Old Gasket to be replaced, GPK3 Pack off
|
December 2006 |
|
Injection and Production tests GPK3 and GPK4
Activation GPK3 and GPK4, Production GPK3 and GPK4, Injection SRT GPK4, Injection OneStep GPK3
|
January 2007 |
|
Stimulation of GPK3 and GPK4 with OCA
Chemical treatment if GPK3 and GPK4 with Organic Clay Acid
|
February 2007 |
|
Production tests GPK3 and GPK4 after OCA-injection
Production of GPK3 and GPK4 for 2-3 days after OCA-Treatment to determine the productivity
|
March 2007 |
|
Injection test 30 l/s into GPK3
Injection of 10.000 qm of fresh water into GPK3 with injection pump
|
June 2007 |
|
Injection test 30 l/s into GPK3
Measurement of T and p on surface, but also downhole with 2 memory tools and one online tool.
Dowhole logging performed by Schulze wellpressure-recording
|
June 2007 |